middle mile

Content tagged with "middle mile"

Displaying 21 - 30 of 119

New Fiber Project in Washtenaw County, Michigan Hopes to Be a Catalyst for Economic Restoration

Washtenaw County (pop. 367,600), home of B-24 bomber, a once booming automotive industry and the University of Michigan, is making strides toward bringing the region back into an economic powerhouse, running 20 miles of fiber from downtown Ann Arbor through Ypsilanti Township, connecting the business and commercial corridors of four different townships ultimately ending at the American Center for Mobility.  

Ann Arbor SPARK, a non-profit economic development organization, received $2.4 million in federal funding from the CARES Act in July to start the Ann Arbor-Ypsilanti Corridor Fiber Optic Backbone project. Ann Arbor Spark contributed $200,000 to the $600,000 local match requirement needed to obtain the funds, while Washtenaw County contributed $112,000, the City of Ann Arbor contributed $138,000, and  Ann Arbor/Ypsilanti Local Development Finance Authority contributed $150,000. 

Shaking off the Rust

Ypsilanti, Michigan (pop. 20,800) led the country in cutting edge automotive manufacturing for decades. Just 5 miles east of Ypsilanti, lay the Willow Run manufacturing complex and airport where Henry Ford produced B-24 heavy bombers for World War II, spurring a flood of workers in the region and ultimately leading to a housing shortage. The influx overwhelmed the market, forcing the Federal Public Housing Administration to step in and build dormitories for the workers. When the war ended, automotive manufacturers shuffled in and out of the complex, continuing to create jobs.

Image

South Hampton Roads Issues RFP for Regional Open Access Fiber Ring

Hampton Roads, a metropolitan region bordering the Chesapeake Bay in southeastern Virginia, is known for its 17th century historical sites, shipyards crowded with naval aircraft carriers, and mile-long bridge tunnels. Home to 1.7 million Virginians, Hampton Roads is now looking to broaden avenues for economic development by leveraging existing transatlantic subsea broadband cables to transform the region into a technology-forward digital port. That’s why regional officials recently issued a Request for Proposal (RFP) seeking one or more private partner(s) to construct a regionally-owned 100-mile, open access fiber ring.

Private partners interested in responding to the RFP [pdf] must do so by August 24, 2021. Potential partners can decide to offer some or all of the project functions, choosing to: design, build, finance, operate, and/or maintain the regional fiber ring. (See instructions on how to respond to the RFP, as well as details on the selection process, under Section IV on Page 7.)

Five of the nine cities that make up the region colloquially referred to as “the 757” - Chesapeake, Norfolk, Portsmouth, Suffolk, and Virginia Beach - banded together to improve local fiber connectivity in 2018, forming the Southside Network Authority (the Authority). 

According to the Authority's RFP, the project was undertaken to resolve the broadband issues faced by the cities, including:

  • a need for more and more affordable internal connectivity for governmental operations

  • equity and affordability concerns in general as compared to similar metropolitan areas

  • a perceived lack of responsiveness by incumbent providers to the needs of the business community and economic development prospects

  • a relative lack of broadband infrastructure by comparison to comparable metropolitan areas

  • and concerns about the security and scalability of existing, privately-owned regional networks

Regional Impacts

Community Broadband Legislation Roundup – July 19, 2021

Snapshot

Maine broadband authority redefines statewide broadband as symmetrical 100/100 Mbps connection

California Legislature and Governor reach $5.25 billion agreement on statewide middle-mile network

New Hampshire matching grant initiative aiming to promote partnerships signed by Governor

The State Scene 

Maine

The Maine Senate recently enrolled a bill (L.D. 1432) amending the Municipal Gigabit Broadband Access Fund to only allow communities, municipalities, and regional utilities access to grants through the program. The bill became law without State Governor Janet Mills’ signature on June 24. 

The legislation removes limits placed on the number of grants able to be awarded per project, but limits the amount of funds that may be distributed per project to 50 percent of total costs. The bill, aiming to support the deployment of municipal gigabit fiber optic networks, also requires the ConnectMaine (ConnectME) Authority to establish minimum upload and download speed definitions to foster widespread availability of symmetric high-speed Internet access, beginning in 2025. 

Virginia County Turns Middle-Mile Project into a Countywide FTTH Network

Patience and persistence can be used to describe what made northern Virginia’s Orange County Broadband Authority successful in turning their middle-mile network into a Fiber-to-the-Home (FTTH) network. While the journey started more than five years ago, today the authority is connecting 20 customers a day with the goal of connecting 4,000 customers by the end of the calendar year. 

Crews will be connecting users to the county-owned FTTH network, FiberLync, in three phases, each requiring between 10-12 months to complete. Phase 1 will pass approximately 4,000 households, phase 2 about 2,500 households, and phase 3 about 1,000.

The funding for these phases will primarily come from bonds set aside as part of the county’s capital improvement plan and will cover up to $15.5 million of the projects’ costs. The bonds will be paid back through FiberLync revenue. 

Years in the Making

Bringing FTTH connectivity to the residents of Orange County (pop. 36,000) has been a goal since the Orange County Broadband Authority was created in 2016. The major driver for the authority was addressing the lack of broadband in the rural parts of the county. Residents in certain parts of the county have long been left with speeds under the FCC’s broadband definition of 25/3 Mbps (Megabits per second), and others have been entirely unconnected.

In 2017, the county worked with Orange County Public Schools to build the middle-mile network connecting district facilities as well as critical county facilities using E-rate federal funds. More than $1.1 million in E-rate funds were used to help connect the schools, accounting for 80 percent of the total project cost. The county and Orange County Public Schools shared the remaining costs of deploying extra capacity for future use.  

Historic Investment in California Broadband - Episode 462 of the Community Broadband Bits Podcast

Last month, California Governor Gavin Newsom announced a historic, $7 billion plan to increase broadband access across the state. On this episode of the Community Broadband Bits Podcast, host Christopher Mitchell is joined by Ernesto Falcon (Senior Legislative Counsel) and Hayley Tsukayama (Legislative Activist) from the Electronic Frontier Foundation to talk about how the funds will be used to bring better connectivity to Californians.

This show is 28 minutes long and can be played on this page or via Apple Podcasts or the tool of your choice using this feed

Transcript below. 

We want your feedback and suggestions for the show-please e-mail us or leave a comment below.

Listen to other episodes here or view all episodes in our index. See other podcasts from the Institute for Local Self-Reliance here.

Thanks to Arne Huseby for the music. The song is Warm Duck Shuffle and is licensed under a Creative Commons Attribution (3.0) license.

Connect This! Episode 13 - Middle-Mile Challenges and Internet Exchange Points

On Episode 13 of Connect This!, co-hosts Christopher and Travis Carter (USI Fiber) are joined by Reid Fishler (Senior Director, Hurricane Electric) and Fletcher Kittredge (CEO, GWI) to talk about the issues that come up in building and maintaining backhaul routes and exchange points. During the show they discuss whether creating a small, rural ISP far from an exchange point is easier or harder now than it was 10 years ago. They talk how resiliency, competition, capacity, reliability, efficiency, cost, and innovation play into the topic, current middle-mile issues in California and Maine, and what the future of the space might look like.

Subscribe to the show using this feed, or visit ConnectThisShow.com

Email us broadband@muninetworks.org with feedback and ideas for the show.

Watch here, or below.

California Governor Proposes $7 Billion Investment in Statewide Middle-Mile, Open Access Fiber Network

In his $100 billion “California Comeback Plan”, California Gov. Gavin Newsom is proposing to devote $7 billion to invest in expanding broadband access over the next three years, with $4 billion of that to be used for constructing a statewide middle-mile, open access fiber network.

The $7 billion earmarked for broadband in the budget proposal, referred to as the “May Revision” [pdf], specifically includes:

  • $4 billion for a statewide middle-mile, open access fiber network to connect Census Designated Places (CDP) which lack access to broadband service capable of providing 100 Megabit per second (Mbps) downstream 

  • $500 million for a Loan Loss Reserve Account, a public financing program to assist local governments, Tribes, and nonprofits financing new municipal fiber networks

  • $500 million for one-time payments to broadband providers serving rural areas where it is more costly to build community networks

  • $2 billion for the California Advanced Services Fund (CASF) to incent existing and new Internet Service Providers to build last-mile infrastructure

Gov. Newsom’s infrastructure plan now heads to the State Legislature, where it must be voted on by June 15.

Newsom’s plan is to allocate this funding over a period of several years, allotting $2 billion of federal Rescue Plan funds in Fiscal Year 2021-22, and $1.5 billion in state General Fund resources combined with $3.5 billion in Rescue Plans funds in Fiscal Year 2022-23. To fund the overall $100 billion budget proposal, if passed, the state would combine a total of $25 billion in federal relief funding with $75.7 billion from the state’s budget surplus.

“Let’s get this done once and for all, so that no future administration is talking about the scourge of the digital divide,” said Gov. Newsom, in a press conference on Friday. “This is what the federal stimulus from my perspective was all about: catalytic investments to make generational change. This is one of those investments.”

Newsom’s Plan Provides Technical Assistance Teams and Loans for Communities

Join Us Thursday, May 20th at 5p ET for Connect This! Episode 13 - Middle-Mile Challenges and Internet Exchange Points

Co-hosts Christopher and Travis Carter (USI Fiber) are joined by Reid Fishler (Senior Director, Hurricane Electric) and Fletcher Kittredge (CEO, GWI). They'll talk about the issues that come up in building and maintaining backhaul routes and exchange points, like resiliency, competition, capacity, reliability, efficiency, cost, and innovation.

The show will begin on Tuesday, May 20th at 5p ET/4p CT. 

Subscribe to the show using this feed, or visit ConnectThisShow.com

Email us broadband@muninetworks.org with feedback and ideas for the show.

Watch here, or below.

Broadband Infrastructure Funding in the American Rescue Plan - Episode 9 of Connect This!

On Episode 9 of Connect This!, hosts Christopher Mitchell and Travis Carter (USI Fiber) are joined by Kim McKinley (Chief Marketing Officer, UTOPIA Fiber) and Doug Dawson (President, CCG Consulting) to talk about the recently signed American Rescue Plan Act, which has the potential to funnel an unprecedented level of funding to communities which can be used for Internet infrastructure.

The group talks about the different buckets of money that will become available and how cities, counties, and states might use them. They discuss the ways that communities can use the federal funds to reduce risk for local projects and push them forward, create partnerships with public organizations and private firms, and what local officials need to do to ensure that they are ready when the money starts flowing to effect long-term positive change.

Watch via this link, or watch below.

Subscribe to the show using this feed

Email us at broadband@muninetworks.org with feedback and ideas for the show. 

Eastern Shore Broadband Takes Fiber Leap With Help from NASA

Hop in a time machine and go back to 2008. It was a banner year for NASA as the space agency celebrated its 50th birthday. Phoenix touched down on Mars, far-off planets were photographed, four space shuttles flew to the International Space Station, and the agency helped send scientific instruments to the moon aboard India’s first lunar explorer.

Meanwhile on Earth, it was the under-the-radar launch of the Eastern Shore of Virginia Broadband Authority (ESVBA) fiber network in 2008 that carried the most practical payload for the people of Accomack and Northampton counties along coastal Virginia. A popular tourist destination “for lovers,” the Eastern Shore is a 70-mile stretch of barrier islands between Chesapeake Bay and the Atlantic Ocean. And thanks in large part to funding from NASA, which operates the Wallops Flight Facility on Wallops Island, the future-proof broadband frontier had finally found its way to the region.  

The two counties of Eastern Shore, Accomack and Northampton, provided an initial sum of about $270,000 to ESVBA to plan the network. It was one small step for high-speed connectivity in the Commonwealth, followed by one giant leap when ESVBA received $8 million in federal and state funds – nearly half of which came from NASA – to build the region’s open access middle mile backbone. When that part of the network was completed, the Wallops Flight Facility and its 1,100 employees were connected to it, as was the National Oceanographic and Atmospheric Administration’s Chesapeake Bay office and an array of area healthcare institutions and schools. 

The Final Fiber Frontier