Tag: "video"

Posted June 1, 2016 by rebecca

Since our founding in 1974, we have worked to rewrite the rules and empower communities to choose their own future. Across several vital economic sectors, we help break the corporate stranglehold that extracts wealth from local economies and undermines democracy.

We give communities the tools to build a strong local economy themselves. From banking to energy, healthy soils to community-owned Internet networks, time and again we have shown that when we level the playing field for individuals and businesses, we improve our economy and the quality of life for all citizens.

Support our work to help communities down the path to local self-reliance. This video illustrates our work, and explains how all of our unique and distinct initiatives, together, build a holistic philosophy of local self-reliance.

Please share it and let others know that we’re fighting for communities to take charge of their whole economy. If you love it, we invite you to make a contribution to our mission of locally-driven economies, because beating back big corporations (or producing awesome animations) isn’t cheap. :)

Posted May 26, 2016 by lgonzalez

After our article earlier this month on US Internet’s problems obtaining permission to install conduit under Minneapolis Park Board boulevard property, several other articles appeared in local media.

TV station KARE 11 ran a piece on the issue and interviewed Julie Stenberg, who observed, "Technically it's park land, but people are not playing Frisbee, they're not picnicking here.” (Watch the video below.)

The Star Tribune also ran an article noting that people like Julie, who live adjacent to park owned boulevards, may never have the opportunity to take Fiber-to-the-Home (FTTH) service from the local provider.  If US Internet wants to obtain a permit to bury conduit along the parkway in order to get to Julie's house - the only option available - they will have to shell out $27,000 in fees. People around the corner from Julie are already getting FTTH service from US Internet.

Permit Denied

According to the Strib, Commissioners denied a permit for boulevard placement and for placement under Minnehaha Creek in South Minneapolis because it lacked the detail they required. The Park Bard is concerned about damage to trees during both conduit placement and any maintenance:

“We’d directional drill, and we’d be 12 to 14 feet under the creek bed,” [US Internet’s Vice President Travis] Carter said. “You will not see anything when we’re done. It’s just a pipe deep underground that nobody will see.”

US Internet has no access to Comcast and CenturyLink poles, so an underground network is its only option. Alleys are too tight to safely use the boring and maintenance equipment, especially in the winter, but the Park Board is not convinced, “It’s really important for USI to demonstrate that there’s no alternative,” [Assistant Park Superintendent Michael Schroeder] said.

Caught Behind A Boulevard And A Creek

Addresses south of Minneahaha Creek may not get access if the two parties do not resolve the problem. In order to reach thousands more homes and businesses they intend to pass, US Internet will need to place fiber under the creek in three...

Read more
Posted May 25, 2016 by rebecca

Tribal governments face unique problems when connecting their communities, but the need is great. 

In this episode of Community Connections, Christopher Mitchell speaks with Matt Rantanen, Director of Technology for the Southern California Tribal Chairmen's Association (SCTCA) and Director of the Tribal Digital Village (TDV) Initiative. Mitchell and Rantanen talk about the special challenges of deploying fiber on tribal lands.

 

Posted May 16, 2016 by htrostle

Ozarks Electric Cooperative has a plan to bring fast, affordable, reliable connectivity to northwest Arkansas and northeast Oklahoma.

Fast, Affordable, Reliable Connectivity At Last

OzarksGo, a wholly owned subsidiary of the electric co-op, will provide Fiber-to-the-Home (FTTH) Internet service with symmetrical speeds of up to a Gigabit (1,000 Megabits) per second. The fiber network will cost $150 million to build over the next six years.

ArkansasOnline and local news station KSFM reported on the future network. The residential FTTH service will have no data caps and OzarksGo will offer additional services, such as telephone and video. At the end of the project, all co-op members will have access to the network's services.

According to the FCC 2016 Broadband report, 25 percent of all Arkansas residents don't have access to broadband (defined as 25 Megabits per second (Mbps) download and 3 Mbps upload). In Oklahoma, the FCC puts the numbers higher at 27 percent. Rural areas are even higher with 48 percent lacking in Arkansas and 66 percent missing out in Oklahoma. Considering the data collection process depends on self-reporting by ISPs, those numbers are considered low. The number of households that do not have access to federally defined broadband, especially in rural areas, is higher.

Soon though, these Arkansas and Oklahoma residents will have access to fast, affordable Internet access. General manager for OzarksGo Randy Klindt, who previously worked on Co-Mo Electric Cooperative's FTTH network, explained in the video below that the price for a Gigabit will be less than $100, which is an entirely opt-in service.

Ozarks Electric Cooperative serves about 71,000 customers, including businesses. Since the service area is so large, OzarksGo will build the network incrementally over the next six years. Each phase will cost between $25 and $35 million - for a total of...

Read more
Posted May 6, 2016 by rebecca

Next Century Cities recently hosted "Digital Northwest," a summit for regional broadband leaders. Leaders from member cities all over the country gathered together to learn from one another and discuss digital inclusion, models for success, partnerships, and much more. 

Chris led a panel of mayors and city council leaders from cities with well-known municipal networks in a discussion of their networks and how their communities have benefitted. 

The panel featured: 

  • Mayor Jill Boudreau, Mt. Vernon, WA
  • Mayor Wade Troxell, Fort Collins, CO
  • City Council President Jeremy Pietzold, , Sandy OR
  • Councilmember David Terrazas, Santa Cruz, CA

Posted April 27, 2016 by rebecca

Every day, community leaders are working to overcome barriers to developing Internet networks. On Monday, April 4, 2016, Chris took part in the Coalition for Local Internet Choice (CLIC) pre-conference panel on Public Perspectives to Partnerships at the Broadband Communities Summit in Austin, Texas. Chris was joined by Gabriel Garcia, Bill Vallee, Jon Gant, and Drew Clark. The panel was moderated by Catherine Rice.

The group discussed strategies, business models, and lessons learned when building a successful public-private partnership (PPP).


Public Perspectives on Partnerships: Lessons Learned and Best Practices

Moderator:

Catharine Rice – Project Director, CLIC

Speakers:

Bill Vallee – Office of Consumer Counsel, State of Connecticut, New Britain, CT

Jon Gant – Director, UC2B

Christopher Mitchell – Community Networks Director, ILSR

Gabriel Garcia – Director, Senior Counsel, General Counsel, Legal Services, CPS Energy, San Antonio, TX

Drew Clark – Chairman and Publisher, BroadbandBreakfast.com

Posted April 21, 2016 by rebecca

On Wednesday, November 18, 2015 Christopher Mitchell sat down with Bill Wallace of US Ignite and Mark Erickson of the city of Winthrop, Minnesota. In part 2 of our ongoing series, Chris, Bill and Mark talk more about the "nuts and bolts" of building a network. Come back each Wednesday for new video content!

This interview is paired with ILSR's report, RS Fiber: Fertile Fields for New Rural Internet Cooperative. The report documents a groundbreaking new model that’s sprung up in South Central Minnesota that can be replicated all over the nation, in the thousands of cities and counties that have been refused service by big cable and telecom corporations.

Posted April 20, 2016 by rebecca

On Wednesday, November 18, 2015 Christopher Mitchell sat down with Bill Wallace of US Ignite and Mark Erickson of the city of Winthrop, Minnesota, to talk about the exciting applications communities can develop if they have the connectivity they need.

This interview is paired with ILSR's report, RS Fiber: Fertile Fields for New Rural Internet Cooperative. The report documents a groundbreaking new model that’s sprung up in South Central Minnesota that can be replicated all over the nation, in the thousands of cities and counties that have been refused service by big cable and telecom corporations.

Stay tuned for Part 2 of this video podcast on RS Fiber, to be released Thursday as part of our ongoing series featuring community and policy leaders in the field.


Posted April 8, 2016 by lgonzalez

As Minnesota's Legislature decides on funding for the state's Border-to-Border Broadband Development Grant Program, local media is calling on state leaders to prioritize local connectivity in the Capitol Chambers. This year, Governor Dayton's office is recommending allocating $100 million to the program.

Blended Is Better

In the past, the Border-to-Border Broadband Development Grant Program has granted funding to areas of only the greatest need, which has resulted in Internet infrastructure deployment in very rural areas. That's great for municipalities, businesses, and residents in those areas who certainly need and deserve better connectivity. Towns where there is some coverage, such as old DSL networks, have typically not qualified. As a result, rural areas of the state are developing "donut holes" of inadequate connectivity. In the long term, this could spell disaster for these towns because businesses have no reason to locate in places where they can't get the Internet access they need for operations. A blended approach will allow investment in both unserved areas and areas where some networks already exist so centers of economic activity can still compete with their neighbors.

Chris provides more information on the blended approach, and on one possible solution for rural communities, in this nicely produced video created by Capitol Almanac:

Minnesota Broadband, 2016

Lawmakers from both sides of the aisle are saying broadband expansion, especially to greater Minnesota, is a priority this session, but there are competing perspectives on how to use any funding the legislature sets aside. In this segment from "Almanac at the Capitol," we hear two takes on how...

Read more
Posted March 10, 2016 by lgonzalez

Pulaski, located in the area Tennesseans describe as the southern middle region of the state, has a fiber network other communities covet. When we contacted Wes Kelley, one of the people instrumental in establishing the network, he told us that the community always wanted to be more than "just Mayberry." Rather than settle for the sleepy, quaint, character of the fictional TV town, local leaders in Pulaski chose to invest in fiber infrastructure for businesses and residents.

A Legacy That Lives On

The county seat of Giles County, Pulaski has a long history of municipal utility service. The electric system was founded in 1891, and is the oldest in the state. The city also provides municipal water, sewer, and natural gas service. The electric utility, Pulaski Electric System (PES), serves most of Giles County, which amounts to approximately 15,000 customers. PES receives power from the Tennessee Valley Authority (TVA) and then distributes it throughout the county.

Pulaski is now known for its Fiber-to-the-Home (FTTH) network, PES Energize, but the city's first adventure in providing municipal Internet access began in 1993. The city developed dial-up service and within five years, 1,500 homes were using the service. The city abandoned the dial-up service to offer Wi-Fi but then sold that system to a private company.

Preparing PES

Leaders in Pulaski had their sights on connectivity beyond the limits of Wi-Fi. In 2002, Mayor Dan Speer and Dan Holcomb, the New CEO of PES, began exploring a publicly owned fiber network. Holcomb had previously lead a Michigan utility that offered cable TV and so used his experience to help establish the PES Energize network. AT&T (BellSouth at the time) provided DSL service and Charter offered cable Internet access but neither company performed to the satisfaction of the community. In fact, Pulaski had always suffered through poor quality service from its incumbents.

When Holcomb arrived, the community engaged a consultant for a feasibility study to examine in detail the idea of a publicly owned fiber network; Holcomb, Speer, and the rest of the city's leadership were not confident about the results. Before the community moved forward, Holcomb felt it was important they carry out a customer survey and a second feasibility study. In the spring of 2003, the organization undertook a...

Read more

Pages

Subscribe to video