fixed wireless

Content tagged with "fixed wireless"

Displaying 141 - 150 of 160

Comments Wanted: Proposed HUD Rule To Expand Low-Income Residential Internet Access

As part of a growing interest in expanding fast, affordable, reliable Internet access for low-income families at home, the United States Department of Housing and Urban Development (HUD) has proposed a new regulation requiring high-speed Internet infrastructure to be installed in HUD-funded multi-family rental housing during new construction or substantial rehabilitation. While the proposed rule doesn’t require developers to pay for Internet service subscriptions, it is a step in eliminating barriers that low-income families face in obtaining quality, consistent Internet access. Public comments are due July 18, 2016.

The proposed rule covers HUD’s rental assistance and grant programs, including its Section 8 housing assistance program, Supportive Housing for the Elderly and Disabled program, Community Development Block Grant program, and Choice Neighborhoods Implementation Grant program. Families living in multi-family housing can then choose to purchase full-priced Internet access from local providers or utilize other resources in their community, which include federal subsidy programs in addition to other state, local, and charitable programs.

Getting Wired Up

As for the actual infrastructure, several types of Internet access technologies satisfy the requirement. Developers can install either wireless (Wi-Fi, fixed and mobile wireless, satellite) or wired (digital subscriber lines also known as DSL, power lines or BPL, cable lines, or fiber) infrastructure. HUD expects most builders will elect to install wired access because of the rapidly changing nature of wireless technologies.

Additionally, wired access is more likely to provide meaningful competition between several Internet Service Providers (ISPs), lowering costs and improving service quality for multi-family housing residents. In an open access network, ISPs typically lease space on infrastructure owned by another entity rather than owning the physical infrastructure themselves. If HUD's new rule called for an open access model, multiple ISPs could utilize a building’s wired infrastructure to offer services to residents. According to HUD’s estimates, which are detailed in the proposed rule, the average construction costs for wired broadband access in its multi-family housing is approximately $200 per unit.

Saratoga Springs Launches Smart City Commission

Saratoga Springs, New York (pop. 5,600 28,000), has launched a Smart City Commission, whose mission is to enhance telecommunications and help the city become a leader in high-speed Internet service.

The startup of the Smart City Commission, which held its first meeting in March, comes as Saratoga Springs pursues becoming a model Intelligent Community. City leaders have determined that the best way to acheive Intelligent Community status, is to join Next Century Cities (NCC), and to adopt the organization's six guiding principles:

  1. High-speed Internet is necessary infrastructure.
  2. The Internet is nonpartisan.
  3. Communities must enjoy self-determination.
  4. Broadband is a community-wide endeavor.
  5. Meaningful competition drives progress.
  6. Collaboration benefits all.

The Commission’s members include chief information officers from the city, library, hospital, school district, as well members of the city’s convention and tourism bureau, the Chamber of Commerce and local business community.  

Learning From Other Communities

“It’s something I had been thinking about for about two years,” City Finance Commissioner Michele Madigan told us, speaking about the Smart City Commission. A key task of the Commission will be to “fill out the questionnaire to ICF [Intelligent Community Forum] and develop a road map to becoming a Smart City,” she told us. “It seemed the best way to move forward on this project was to get a core group of stakeholders involved from the city.”

Membership in NCC will allow Saratoga Springs access to a network of knowledge from other cities that have the same desire to bring ubiquitous high-quality Internet access to their communities. The Intelligent Community Forum is a worldwide association of cities and regions dedicated to helping communities use information and communications technology to, among other things, address social problems and enhance the economic quality of local life. 

Goal: Gig Speed, Wi-Fi For Now

Haywood County, NC, Releases Feasibility Study RFP

Last month, the Haywood Advancement Foundation (HAF) sowed the seeds for a long-term broadband strategy in Haywood County, North Carolina. The nonprofit foundation posted a Request for Proposals (RFP) for a feasibility study as part of their strategy to develop a master plan and improve local connectivity. A $10,000 grant from the Southwest Commission and a matching $10,000 grant from HAF will fund the early stages of Haywood’s broadband initiative. The due date for proposals is July 15th.

Living In The Present, Planning For The Future

Located about 30 minutes west of Asheville, Haywood County is home to approximately 60,000 residents. Asheville’s status as a cultural hub might be driving up Haywood County property values, but it has failed to bring high quality Internet access to its rural neighbors. 

State law complicates local municipalities' ability to provide fast, affordable, reliable connectivity via municipal networks. North Carolina’s HB 129, passed in 2011, and is currently under review in the Sixth Circuit Court of Appeals. The Federal Communications Commission (FCC) overruled the state law in early 2015, citing the bill’s burden on the national goal of advancing ubiquitous Internet access. North Carolina and Tennessee challenged the FCC’s decision, oral arguments were heard in March, and all participants are now waiting for a ruling. A master plan can help the community establish different courses of action, depending on the ultimate outcome of the court case.

Highlands, North Carolina, Learns To Fish With Altitude Community Broadband

Highlands is a small community of less than 1,000 residents located in the Nantahala National Forest in the Appalachian Mountains. Along the western tip of the state, Highlands faces the same problem as many other rural communities - poor connectivity. In order to bring high-quality Internet access to residents and businesses, Highlands has implemented a plan to deploy city-owned Internet network infrastructure.

A Connected Escape Up In The Mountains

Highland entertains a large number of summer tourists who flock to its high altitude to escape summer heat and humidity. Summer visitors can fill the city’s six square miles and surrounding area with up to 20,000 people. The city operates a municipal electric utility along with water, sewer, and garbage pick up. 

To round off the list of offered services and bring better connectivity to the community, Highlands created the Altitude Community Broadband. In January, the Town Board authorized to borrow $40,000 from its General Fund and $210,000 from its Electric Enterprise Fund to deploy and launch the new service. The loan will be repaid with revenue from the new service.

The town has long-term plans to offer both Fiber-to-the-Home (FTTH) and fixed wireless service to residents and businesses in the downtown area. Fiber is already available in limited areas within Highlands proper; pricing is available on a case-by-case basis. The landscape is rugged, so residents outside of the city may not be able to transition to FTTH, reported a December HighlandsInfo Newspaper, but the fixed wireless access is still an affordable and workable option in a place considered a poor investment by large providers.

Residential options for Altitude Wireless Internet Access are:

Greenfield, MA, Humming With Hybrid Fiber-Wireless

Residents and businesses in the rural Massachusetts Town of Greenfield are in the process of gaining faster and more affordable Internet service thanks a new municipally-owned hybrid fiber-wireless network. In November, more than 80% of voters passed a ballot referendum to authorize the city to create a nonprofit entity to construct and operate the network.

While scheduled completion is not until spring 2017, some customers will be able to start service during the network’s construction period starting in July. Thanks to the Greenlight pilot program, customers and network operators are already experiencing the new service. Upon completion of an engineering study to iron out the precise plans for the network, the city will start construction of the 80- to 100- mile fiber network. There will be as many as 1,000 wireless access points.

How Does it All Work?

Residents and businesses seeking the fastest available connection to the network will install an antenna on their property. Although prices for the antenna-based service have not yet been determined, the likely base charge for a symmetrical 25 Megabits per second (Mbps) connection will be $29.99 per month. The city expects to offer speeds as fast as 1 Gigabit per second (Gbps). The network will provide Internet, telephone service, and possibly video.

Customers seeking basic Internet access will be able to connect directly to the access points from their personal wireless devices for as little as $9.95 per month. A consultant for the project said that low income residents in the city may be able to get almost free access to this lowest tier plan after reimbursement through Lifeline, an FCC program that provides a subsidy to all low income Internet users.

The town is providing an upfront loan from the general fund of $5 million to pay for the network. Prices for access to the network may decrease as new customers sign up and revenues grow. Eventual profits from the network could also go back into the town’s general fund to spend down the initial loan.

RS Fiber: Fertile Fields for New Rural Internet Cooperative

Image

A new trend is emerging in rural communities throughout the United States: Fiber-to-the-Farm. Tired of waiting for high-quality Internet access from big companies, farmers are building it themselves. 

Communities in and around Minnesota’s rural Sibley County are going from worst to best after building a wireless and fiber-optic cooperative. While federal programs throw billions of dollars to deliver last year’s Internet speeds, local programs are building the network of the future. 

In “RS Fiber: Fertile Fields for New Rural Internet Cooperative,” the Institute for Local Self-Reliance (ILSR) and Next Century Cities documents a groundbreaking new model that’s sprung up in South Central Minnesota that can be replicated all over the nation, in the thousands of cities and counties that have been refused service by big cable and telecom corporations.  

Tired of Waiting: Farmers Build Their Own Fiber-Optic Co-op

21st century farms require 21st century connectivity. Denied access by telephone and cable companies, they created a new model. 

In the report you’ll meet: 

  • Mark Erickson, of the city of Winthrop. Erickson is the local champion that has breathed life into RS Fiber. Without the project, the city of Gaylord would have not attracted the forthcoming medical school. “We have that opportunity because of the Fiber-to-the-Home network. Without it, no medical school.”
  • Linda Kramer, of Renville County. Kramer’s family farm relies on the Internet to upload soybean and wheat reports to business partners. DSL connections are simply not fast enough to handle the massive amount of data agricultural businesses need in order to stay competitive with the Farming Industrial Complex that is the reality of the 21st Century. 
  • Jacob Rieke, a 5th generation family farmer. Rieke’s motivation for backing the project was his pre-school aged daughters. Not wanting to put them at a disadvantage to their peers in other cities, he considered moving to a different location in order to have access to Internet.

From the technologies to the financing, rural communities can solve their problems with local investments. 

Webpass and Its Fixed Wireless Seek Fix for Landlord Abuses - Community Broadband Bits Episode 197

San Francisco is one of the rare cities that has multiple high quality ISPs competing for market share, though the vast majority of people still seem to be stuck choosing only between Comcast and AT&T. This week, we talk to a rising ISP, Webpass, about their success and challenges in expanding their model. Charles Barr is the President of Webpass and Lauren Saine is a policy advisor - both join us for episode 197 of the Community Broadband Bits podcast. 

We discuss the Webpass model, which uses fixed wireless and fiber to serve high density apartment buildings where they are allowed in by the landlord. Unfortunately, they have been locked out of many of these buildings and are looking to the city of San Francisco to adopt better policies to ensure a single provider like AT&T cannot monopolize the building. Though the FCC has made exclusive arrangement unenforceable, the big providers are still finding ways to lock out competition. We also talk a little about the role of fiber and fixed wireless technologies, chokepoints more generally, and why Webpass is so sure it could succeed if residents were all able to to choose the ISP they wanted. 

This show is 27 minutes long and can be played on this page or via Apple Podcasts or the tool of your choice using this feed

Transcript below. 

We want your feedback and suggestions for the show-please e-mail us or leave a comment below.

Listen to other episodes here or view all episodes in our index. See other podcasts from the Institute for Local Self-Reliance here.

Thanks to Kathleen Martin for the music, licensed using Creative Commons. The song is "Player vs. Player."

Gigabit Awards Contest From Siklu: RFI Deadline March 14th

Siklu, known for its wireless technology innovation, is now in the process of granting a number of "Gigabit Awards." Their goal is to offer municipalities an opportunity to use their high-speed wireless technology.

Who Can Compete?

Communities who can offer quick deployment and meet the company's qualifying criteria will win the equipment package. A municipality will need the following to be considered for a "Gigabit Award":

1. An existing fiber network with accessible PoPs, and the ability to provide internet services over this network 


2. The capability to install (internally or with a partnering ISP) the Gigabit links within a tight deployment schedule


3. Free services to underserved locations will be considered as an advantage: affordable housing, community sites, school facilities 

The Siklu equipment package includes:

1. 10 gigabit links to connect buildings (MDUs, anchor institutions etc.) 


2. Wireless planning, training and support services 

Speed Is Of The Essence

The RFI submission deadline of March 14th is fast approaching and "Gigabit Award" announcements will begin on March 21st. Rollout plan submissions, approvals, and kick offs will all happen in April with completion goal scheduled for May 31st, 2016.

For more details, download the Gigabit Award Checklist, which contains information on RFIs, or contact Siklu's Boris Maysel at boris.m(at)siklu.com.

Durango's Dark Fiber Fosters Wi-Fi Freebie

Last fall, Durango joined a number of other Colorado communities that voted to reclaim local telecommunications authority. This January, the city began using its fiber resources to partner with a private provider and offer free Wi-Fi along the downtown corridor.

The move is one step in the city's plan to optimize use of its fiber resources. At the moment, Wi-Fi appears to be the center point of that plan, with special attention focused on increasing competition so residents and businesses will benefit with lower prices and more choice. From a January article in the Durango Herald:

Some rural residents with slow Internet also should have more service options by the end of the year, courtesy of CenturyLink, SkyWerx, AlignTec and BrainStorm.

“A lot of people are working on it. ... In certain geographies we’re going to see overlapping solutions,” said Roger Zalneraitis, director of the La Plata County Economic Development Alliance.

Durango has leased dark fiber for over 20 years and operates its own I-Net for municipal and La Plate County facilities. The Southwest Colorado Council of Governments (SWCCOG) has been developing an open access regional fiber network since 2010, funded through local communities and the Colorado Department of Local Affairs. The SWCCOG is now working with the Colorado Department of Transportation and the La Plata County Economic Development Alliance to determine if and where there are gaps in the fiber network.

Due to the expense of fiber optic lines, the difficult topography, and the remote locations of some La Plata county residents, community leaders are looking at microwave wireless as a way to deliver Internet access to a number of people.

Local video on the Wi-Fi install:

Island Community Builds Their Own Network: Coverage in Ars and Video From The Scene

Island living has its perks - the roar of the waves, the fresh breeze, the beauty of an ocean sunset - but good Internet access is usually not one of them.

A November Ars Technica article profiles Orcas Island, located in Washington state. Residents of the island's Doe Bay chose to enjoy the perks of island living and do what it took to get the Internet they needed. By using the natural and human resources on the island, the community created the nonprofit Doe Bay Internet Users Association (DBIUA). The wireless network provides Internet access to a section of the island not served by incumbent CenturyLink. 

DBIUA receives its signal from StarTouch Broadband Services via microwave link from Mount Vernon on the mainland. Via a series of radios mounted on the community's water tower, houses, and tall trees, the network serves about 50 homes with speeds between 30 Megabits per second (Mbps) download and 40 Mbps upload. Residents who had previously paid CenturyLink for DSL service were accustomed to 700 Kilobits per second (Kbps) download except during busy times when speeds would drop to 100 Kbps download and "almost nothing" upload.

Outages were also common. In 2013, after a 10-day loss of Internet access, residents got together to share food and ideas. At that meeting, software developer Chris Sutton, suggested the community "do it themselves." 

Island Self-Reliant

The talent to make the project successful came forward to join the team. In addition to Sutton's software expertise, the island is home to professionals in marketing, law and land use, and a former CenturyLink installer. The network went live in September 2014 and is slowly and carefully expanding to serve more people.

Doe Bay realized that they could solve the problem themselves. Ars quoted Sutton:

Just waiting around for corporate America to come save us, we realized no one is going to come out here and make the kind of investment that’s needed for 200 people max.